|
|
Canals and stormwater
Finished Canals
- The canals can be filled with water within as little as 60 minutes after setting of the concrete
-
The canals can be trafficked by machines to remove sediment
- The canals can be scraped with balls of barbed wire to remove weeds. No obstructions to catch the wire
- When canals are empty they will not float with high water tables provided the cells are installed according to our specifications
- Concrete strength specification can be reduced as it is needed only for abrasion and water chemical attack, not for structural strength. In particular concrete thickness can normally be reduced
| |
|